Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 14 results ...

Bediawan, D (2003) Determinants of process innovation on construction projects from contractors' perspective, Unpublished PhD Thesis, , Queensland University of Technology.

Cheung, F K T (2005) Development and testing of a method for forecasting prices of multi-storey buildings during the early design stage: The storey enclosure method revisited, Unpublished PhD Thesis, , Queensland University of Technology.

Creedy, G D (2006) Risk factors leading to cost overrun in the delivery of highway construction projects, Unpublished PhD Thesis, , Queensland University of Technology.

Fox, P W (2003) Construction industry development: Analysis and synthesis of contributing factors, Unpublished PhD Thesis, , Queensland University of Technology.

Fraser, C (1998) Personal factors influencing managerial effectiveness: A study of Australian construction site managers, Unpublished PhD Thesis, , Queensland University of Technology.

  • Type: Thesis
  • Keywords: effectiveness; measurement; construction site; site manager
  • ISBN/ISSN:
  • URL: https://eprints.qut.edu.au/107087/
  • Abstract:
    Previous research into site managerial effectiveness in the construction industry has been primarily results orientated - based on factual evidence relating to project completion within prescribed parameters of time, cost and quality. These are factors often influenced by circumstances not within the control of the construction site manager. Thus, a need for a nonresults- based effectiveness measurement tool has been identified. Additionally, beliefs exist within the construction industry regarding personal attributes of managers which are thought to influence their effectiveness. There is a need to identify the personal factors which do actually influence effectiveness as distinct from those which are falsely believed to have influence. This research has developed such a non-results-based effectiveness measurement tool. Subordinates, peers and superiors of 46 current construction site managers, and a control group of 15 failed site managers, evaluated their site manager over 52 competency elements summated to establish an overall effectiveness score. A series of personal factors, which senior managers who recruit and promote site managers believed influenced the effectiveness of site managers, were identified. Each personal factor was then tested for correlation against the effectiveness score.

Kwok, T L (1998) Strategic alliances in construction: A study of contracting relationships and competitive advantage in public sector building works, Unpublished PhD Thesis, , Queensland University of Technology.

Liston, J (1994) Contractor prequalification, Unpublished PhD Thesis, , Queensland University of Technology.

Magub, A T (2006) Experiences of the phenomenon of internet use for information sharing on construction projects and skills set identification for effective project participation, Unpublished PhD Thesis, , Queensland University of Technology.

Pongpeng, J (2002) Multicriteria and multidecision-makers in tender evaluation, Unpublished PhD Thesis, , Queensland University of Technology.

Rahman, A (2014) The determinants of multinational contractors' willingness to bid for Australian public sector major infrastructure projects: deploying the eclectic paradigm of internationalisation, Unpublished PhD Thesis, Civil Engineering and Built Environment School, Queensland University of Technology.

Runeson, G r (1996) Models of construction price determination: A comparative appraisal, Unpublished PhD Thesis, , Queensland University of Technology.

Teo, P (2014) The effect of procurement on competition and flexibility : determining the suitability of public-private partnerships in major infrastructure projects, Unpublished PhD Thesis, Civil Engineering and Built Environment School, Queensland University of Technology.

Yang, J (1991) An expert system for project analysis and control, Unpublished PhD Thesis, , Queensland University of Technology.

Zarkada, A (1998) Tendering ethics: A study of collusive tendering from a marketing perspective, Unpublished PhD Thesis, , Queensland University of Technology.